PVH’s latest tracker platform supports up to 2° post-to-post slope variation, enabling terrain-following installations that reduce earthworks and expand site viability, while maintaining structural reliability.
Why 2° Post-to-Post
- Less earthworks: reduced cut & fill, fewer benches and steps.
- More parcels qualify: better fit for rolling terrain and constrained sites.
- Simpler planning: more predictable schedules and reduced risk of delays.
- Full documentation: compliance with IEC 62817 / UL 3703 and PVH QA/QC pack.
- Total compatibility: no changes to modules, stringing, or SCADA concepts.
Results that stand out
- Civil cost savings on complex sites.
- Fewer heavy-equipment days, with lower environmental impact.
- Greater execution reliability, thanks to controlled tolerances and standardized processes.